Most of what decides whether a house goes well is settled before anyone pours concrete. These are the questions families actually ask, answered properly, with the source named beside each rule.

When you are ready to plan, the services set out what the practice does, and a consultation for future home buyers looks at a lot or house before you commit.

A chart showing how the cost of changing your mind rises through a project A stepped chart. The horizontal axis runs through five stages of a project: consultation, concept, drawings, permit and build. The vertical axis is the cost of making a change. The step is almost flat through consultation and concept, rises at drawings, rises further once the set is filed for permit, and is highest during construction. A marked line at the concept stage shows where the client approves the design, which is the point before which a change costs nothing. consult concept drawings permit build you approve the design here cost of a change
Why the guides lean so hard on the early stages: the cost of changing your mind climbs at each step, and it is lowest while everything is still on paper. Most of the questions these guides answer belong to the flat left end of this chart.

Start with the building code

The sections of PD 1096 a house meets, and the places where the decree says something other than what people assume.

Before you commit

The decisions that are cheap to change now and expensive to change later.

Getting it approved

What the building office asks for, and why applications come back.

Designing for here

What the Philippine climate does to a house, and what to do about it.

Check a room

Test one room from your plan against the code's minimum sizes, ceiling heights and window openings.

Read your plans

What each sheet of a house plan shows, who signs it as the Supreme Court settled in 2023, what every symbol means, and what the floor plan apps can and cannot do.

Check a stair

Plan a stair from the height between floors, or check its rise, run, width, headroom and handrails.

Check a lot

See how much of a lot a house may cover, what a 2 m clearance leaves, how far a window must stand from the neighbour, and how fast the ground under a Pampanga lot is sinking.

Know what the neighbours are owed

Right of way, windows facing the next lot, drainage, riverbanks and party walls, and the water on your own land, with the article behind every distance.

Move in legally

The steps from building permit to occupancy permit, the fire certificates both depend on, the accessibility sizes of BP 344, what the Clean Water Act asks of a house, how a septic tank is designed, and declaring the finished house for tax, each with the section of the law behind it.

Hire an architect and a builder

How to check an architect's licence and a contractor's PCAB license, what the Architecture Act puts on your plans, and what the Civil Code makes the contractor and the designer answer for.

Buying a house and lot

What PD 957 gives a buyer, from the license to sell to the title, the lot and house sizes BP 220 sets for socialized and economic projects, what PD 1529 says to read on the title itself, what the Maceda Law keeps for a buyer on instalments, what RA 9904 gives a homeowner once the association runs the subdivision, what the Condominium Act makes a unit, which office hears a complaint under RA 11201, what a deed of absolute sale does, what zonal value means, how long-occupied land is titled under RA 11573, and what RA 7279 asks of developers.

Start your project

Tell us where the lot is, what you want on it and roughly when. Every project is quoted after a free consultation, so the first message costs nothing and commits you to nothing.

Ask a question

Ask a question

Tell us what you are thinking about and a person will explain what a project like it involves. For a quote, use the enquiry form.