BP 220, the standards for socialized and economic housing

Batas Pambansa Blg. 220 of 1982 lets housing for low and average income families be built to lighter standards than an ordinary subdivision under PD 957. The standards themselves are in its implementing rules, last revised in November 2008. They come in two levels, economic and socialized, and set the smallest lot, the narrowest frontage, the smallest house and the rest. Every figure below carries the section and page it was read from.

What single detached, duplex and row house mean in practice is in the types of houses guide. The balanced housing share a developer owes is in the RA 7279 and RA 10884 guide.

BP 220 standards, economic and socialized side by side

Each row gives both levels and where the rule is in the 2008 rules. Where the two levels differ, it is in lot size, the row house frontage, floor area and how finished the house is handed over; the building standards inside the house are the same for both.

Lot size

PointEconomicSocializedSection and page
Single detached 72 m² 64 m² Section 5.C.2(b), Table 7, printed page 13, amended by Board Resolution No. 824, series of 2008
Duplex or single attached 54 m² 48 m² Section 5.C.2(b), Table 7, printed page 13. Note 1: duplex and row house lots are sold with the house
Row house 36 m² 28 m² Section 5.C.2(b), Table 7, printed page 13

Lot frontage

PointEconomicSocializedSection and page
Single detached, corner or regular lot 8 m 8 m Section 5.C.2(c), Table 8, printed page 13, amended by Board Resolution No. 824, series of 2008
Single detached, irregular lot 4 m 4 m Section 5.C.2(c), Table 8, printed page 13
Single detached, interior lot 3 m 3 m Section 5.C.2(c), Table 8, printed page 13
Duplex or single attached 6 m 6 m Section 5.C.2(c), Table 8, printed page 13
Row house 4 m 3.5 m Section 5.C.2(c), Table 8, printed page 13. The note: at most 20 row house units per block or cluster, never more than 100 m long

The house on the lot

PointEconomicSocializedSection and page
Floor area, single-family dwelling 22 m² 18 m² Section 5.C.4(a), printed page 14
How finished it is handed over complete house shell house, doors and windows Section 5.C.4(b), printed page 14: economic housing is complete per the submitted specifications; socialized housing is at least a shell house with doors and windows to enclose the unit
Front setback 1.5 m 1.5 m Section 5.C.5(a), printed page 14
Side yard 1.5 m 1.5 m Section 5.C.5(b), printed page 14: from the building line
Rear yard 2.0 m 2.0 m Section 5.C.5(c), printed page 14
Building up to the lot line with a firewall with a firewall Section 5.C.5(d), printed page 14: abutments per the National Building Code. Section 5.C.4(b): a firewall is mandatory for duplex and single-attached units and at every row house unit

Inside the house

PointEconomicSocializedSection and page
Headroom where there is no ceiling 2.0 m 2.0 m Section 6.A.2(b)(1), printed page 24. For rooms with a ceiling the text gives no figure; its Figure 5, "Minimum Ceiling Heights", is dimensioned 2.00 m
Mezzanine 1.80 m clear above and below 1.80 m clear above and below Section 6.A.2(b)(2), printed page 24: covering no more than half the floor below it (50%, as printed)
Door height 2.0 m 2.0 m Section 6.A.2(c)(1)(b), printed page 25: bathroom and mezzanine doors 1.80 m
Door widths main 0.80 m, bedroom 0.70 m, bath 0.60 m main 0.80 m, bedroom 0.70 m, bath 0.60 m Section 6.A.2(c)(1)(c), printed page 25: minimum clear widths, main, service or bedroom, and bathroom doors
Windows, habitable rooms a tenth of the floor area (10%) a tenth of the floor area (10%) Section 6.A.2(c)(2)(a), printed page 25: total free area of openings
Windows, bathrooms 1/20 of the floor area 1/20 of the floor area Section 6.A.2(c)(2)(b), printed page 25
Stair width 0.60 m 0.60 m Section 6.A.2(c)(3)(a), printed page 26: minimum clear width
Stair riser and tread riser 0.25 m max, tread 0.20 m min riser 0.25 m max, tread 0.20 m min Section 6.A.2(c)(3)(b), printed page 26: treads exclusive of nosing
Stair headroom and landings 2.0 m; landings 3.60 m apart at most 2.0 m; landings 3.60 m apart at most Section 6.A.2(c)(3)(c) and (d), printed page 26
Handrail height 0.80 to 1.20 m 0.80 to 1.20 m Section 6.A.2(c)(3)(e) and (f.1), printed page 26: one handrail where a guard or wall is on the other side; none needed under 4 risers

Between units

PointEconomicSocializedSection and page
Firewall 150 mm masonry 150 mm masonry Section 6.A.2(f), printed page 28, amended by Board Resolution No. 824, series of 2008: wherever a dwelling abuts a property line; at least 150 mm (6 in.) thick, rising 0.30 m above the highest point of the roof and extending 0.30 m beyond the outermost edge of the units; no openings; ceilings not continuous between units
Courts and yards 2.0 m minimum dimension 2.0 m minimum dimension Section 6.A.1(d), printed page 23: inner courts connected to a street or yard by a passage at least 1.20 m wide; 1.50 m allowed in cluster units of one or two storeys with adjacent courts of at least 3 m²
Condominium or multi-family unit floor area 22 m² 18 m² Section 6.B.2(a), printed page 35: for BP 220 condominium projects, 18 m²

What it means when you buy or build

  • Check the lot against Table 7 before you pay. A single detached lot in an economic project is at least 72 m², and in a socialized project at least 64 m². A smaller lot sold as single detached is worth asking about. The PD 957 guide covers the buyer's rights that apply to both kinds of project, and the land title guide what to read on the title.
  • Socialized means a shell, unless the contract says more. The minimum a socialized project hands over is a shell house with doors and windows. What is finished beyond that is in the specifications you sign, so read them.
  • A row house or duplex shares a firewall. It runs 0.30 m above the roof and 0.30 m beyond the front and back of the units, with no openings. Extending a row house later means working with that wall, which the house extension guide covers.
  • Small lots leave little room for change. With 1.5 m at the front and side and 2.0 m at the rear, a 64 m² lot has a small area left to build on. Our renovation and expansion planning starts from what the lot and the rules still allow.
A lot in plan, showing how required setbacks reduce it to the area a house may occupy A plan view of a rectangular lot with a road along its front edge. Inside the lot boundary, a smaller hatched rectangle marks the buildable area that remains once the required setback is taken off all four sides. Unnumbered dimension arrows mark the gap on each side. the lot you buy what you may actually build on setback on every side road
Where the BP 220 setbacks fall on a lot: 1.5 m at the front, 1.5 m at the sides measured from the building line, and 2.0 m at the rear (Section 5.C.5, printed page 14). The drawing is unnumbered and not to the BP 220 lot sizes; the figures are in the table above.

What this page does not cover

  • Later amendments. This page reads the Revised IRR of November 2008, with the amendments of HLURB Board Resolution No. 824 of that year. HLURB's functions passed to DHSUD under RA 11201, and any later HLURB or DHSUD issuance that changes these standards could not be checked for this page. Ask DHSUD or the developer which rules the project was approved under.
  • Price ceilings. What makes a project economic or socialized is its selling price, set by government issuances that change over time. This site does not print prices.
  • Subdivision design. Roads, open space, parks, community facilities and utilities for the project as a whole are in the same rules and are left out here.
  • Approval, registration and the licence to sell. Rules III to V cover what the developer files; this page is about the lot and the house.

Source: Revised Implementing Rules and Regulations for BP 220 (with amendments), Housing and Land Use Regulatory Board, November 2008, from the file DHSUD publishes. The law is on the Lawphil Project.

Buying in an economic or socialized project, or planning to build on one of its lots?

Arktektura helps buyers read a lot and designs houses and extensions across Pampanga, Bulacan, Bataan, Tarlac and Olongapo.

Ask a question

Ask a question

Tell us what you are thinking about and a person will explain what a project like it involves. For a quote, use the enquiry form.